How do I handle vendor load-in, setup, and teardown efficiently?

Smooth vendor logistics from load-in to teardown

A coordinated load-in schedule and clear staging areas prevent bottlenecks. Assign load-in windows and provide vendors with rules and site maps well before the event.

Load-in best practices:

  • Stagger arrival times by vendor type and size to manage dock space.
  • Provide a contact list with on-site supervisors for each vendor.
  • Mark staging areas, storage rooms, and equipment zones on a site map.

Teardown planning:

  1. Communicate teardown windows and expectations about cleanup and waste removal.
  2. Keep a checklist of items owned by vendors and recovery procedures.
  3. Inspect the venue after teardown and document any damages promptly.

Efficient load-in/out relies on punctuality, good signage, and a single coordinator who enforces the timeline. This saves time and avoids conflicts between vendors.